Epstein Project

EFTA00035918.pdf

Type
pdf
Source set
data-set-8

Original source

Extracted text

Federal Bureau of Prisons 
54999 
MR 05B Monthly Security Report 
ACTIV 
From 4/1/2024 to 4/30/2024 
ISS-01-CAA 
Monthly
Region: NER 
Month Code: 7 
Institution: CAA 
Institution Security System Information 
System Type: Institution Security System 
Manufacturer: Qognify 
Scheduled: 4/8/2024 
Model: Core Sener 
Completed: 4/11/2024 
Installed: 
Man hours this Month: 1.00 
This Work Order has not been completed! 
408 
Camera Total (Enter Total Number of Cameras.) 
Yes 
Camera Total Change (Has this number of Cameras Increased or decreased from the previous reporting month?) 
Eght new cameras were installed in Food Service bringing the total camera count to 408. 
Camera Total Comments (If Yes provide Comments as to the change in number.) 
No 
Operational (Are all Cameras and Recording devices operating per manufacturers specifications and policy?) 
Two cameras were blurry. Work orders were created and repairs made. 
Operational Comments (If No provide Comments as to what has occured and how it is being addressed.) 
All repairs and maintenance has been correlated and documented via work order. 
Comm Tech Comments (Required) 
All cameras and recording equipment are currently in working order. Every maintenance and repair is kept track of and documented in the file for the 
Institution Security System 
Facility Manager Comments (Required) 
After reading the report, I agree with all of the information it contains. 
Captain Comments (Required) 
Yes 
Recording (Is the system capable of recording video?) 
Comm Tech: 
Facility Manager: 
Captain: 
Sensitive 
1 
EFTA00035918

Open in the interactive archive →